May 10th, Hilton Manchester, Stand 2
Mardix will be taking the opportunity of DCD’s first ever visit to
Manchester to tackle key issues that are dominating the data centre
landscape. Linking in with the exhibition’s theme of overcoming legacy
issues to deliver energy efficient, fit for purpose facilities and
infrastructure, there will be on stand advice and demonstrations of the
latest technologies and solutions:
1. Retrofit solutions to solve legacy issues
We can retrofit our market leading iPDU technology to provide branch
power monitoring of final circuits, whilst our iTherm system using
ExerTherm thermal monitoring sensors and Mardix’s 24/7/365 monitoring
and trending software can also be retrofitted to switchgear and PDUs to
provide predictive fault analysis of your data centre’s key power
distribution equipment.
2. Power management
Our on stand team will be demonstrating the iPDU Rack Mount unit
providing power management at final circuit distribution level. They
will also be on hand to discuss our head-end Power Management System
(PMS) with real-time information, alarms, data logging and reporting.
3. Carbon footprint reduction
Mardix can provide a full range of power distribution solutions
designed to manage and reduce energy consumption and your carbon
footprint. Our integrated approach to the power life cycle can
facilitate cost efficiencies without compromising on power availability
or power quality.
4. Bridging the gap between ICT and facilities
IT equipment power loadings and energy consumption have historically
been managed separately to that of buildings’ electrical distribution
networks. Mardix’s iPDU and remote PMS solution brings building and ICT
power and energy monitoring under the umbrella of a single system.
Power Management Director Andy Banks, who will be on hand throughout the exhibition, comments:
“We are very much looking forward to the exhibition. The theme of
legacy issues is right on topic and echoes an industry wide picture. Our
technologies have been developed with exactly these issues in mind.
With a range of retrofit and new build options we are well placed to
deliver solutions that are fit for purpose now – and for the future.”